IKB Engineering — Back-Propping Design Tool
#
Level Name
Zones
+ Add Level (builds upward ↑)
Project Summary
Total levels0
Total zones0
Props in library0
StatusNot calculated
Quick Help
① The Base Level is always the lowest level — rename it as needed (e.g. Ground, Podium).
② Add levels above the base using Add Level — they build upward.
③ Click Zones → on any upper level to define pour zones and back-propping.
④ Hit Calculate to run the back-propping analysis.
Type / Model
Extension
Capacity
Default
+ Add prop to library
Add Prop
Project
Project 10354
Job No. 10354
Parameters
Density kN/m³
Max spacing m
Pour Scenarios
No results yet
Configure levels & zones, then click Calculate
Results will appear here
Pour / Zone
No results yet — click Calculate
👷
Select a pour to view back-propping visualisation